Category

International projects from our partners

Projects of Top-Inform from 2019-2021

By International projects from our partners

Partner company Top-Inform

Our partner company Top-Inform has completed the following projects in 2019-2021:

2019
German Society for International Cooperation (GIZ) project " Energy Efficiency in Municipalities II"

The energy audit for 38 municipal buildings (school, kindergartens, administrative buildings) in Ukraine according to DIN EN 16247 was successfully carried out.

2019-2020
German Energy Agency (DENA) project "System Transformation Ukraine"

The energy audit for district heating supply for 2 cities and an energy audit for a municipal building in Ukraine according to DIN EN 16247 were successfully carried out.

2019-2021
German Society for International Cooperation (GIZ) project " Introduction of energy monitoring systems in enterprises"

Development of the concept of energy monitoring systems for 9 companies according to the standard ISO 50006.

Projects of Top-Inform in 2018

By International projects from our partners

Partner company Top-Inform

Our partner company Top-Inform has completed the following projects in 2018:

2018
Project German Society for International Cooperation (GIZ) "Energy efficiency in hospitals "

It was successfully carried out the energy audit for 2 hospitals in Ukraine in accordance with DIN EN 16247.

2018
Project Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) " Consulting of companies on energy efficiency"

The energy audit for 18 bakery companies in Ukraine according to DIN EN 16247 / ISO 50002 was successfully carried out.

Hotel Favor Park

By International projects from our partners

Hotel Favor Park

Planning period

2019

GFA

135000 m²

Services

  • Water quality
  • Ventilation
  • Air conditioning
  • Heating

Water quality

The hotel is designed and operated to ensure very high quality drinking water. Due to the continuous maintenance of drinking water quality, flood water treatment has been ensured. The system is disinfected and purified, this is confirmed and analyzed by quality certificates before the opening of the hotel. The water quality complies with the German standards: DIN 2000, the German Drinking Water Act.
Water supply pipes made of Geberit stainless steel and universal Rehau Rautitan Flex according to DIN 1988.

Ventilation

All rooms have a ventilation system. All air conditioners have double filtration EU3 + EU7 to protect against polluted air to use additional equipment (activated carbon filter near the airport).

Air conditioning

Use of a chiller fancoil system with a heat pump using glycol / water heat exchangers.

Heating

Fancoil system with combination of radiators and floor heating.

Electrical installations of entire building

Construction of a residential villa

By International projects from our partners

Construction of a residential villa

Planning period

2020

GFA

ca. 190 m²

Services

  • HVAC
  • Construction
  • Implementation

With our support a beautiful house was completed in summer 2020. Our engineers did the static calculation and the calculations and planning for heating, ventilation, air conditioning and sanitary.

According to the plans, the drywall construction and the installation of heating, ventilation, air conditioning and plumbing were completely implemented.