House renovation in Icking, 270 m²

By Projects, Uncategorized

House renovation

PLANNING PERIOD

December 2020 – July 2021

GFA

ca. 270 m²

SERVICES

Core renovation with modernization and renovation of the house

1. Inventory
The property is a 390 m2 single-family house in southern Germany, which due to its age no longer met the current energy requirements and also had major visual defects. In addition to the visual and energetic restoration, a strong focus should be placed on the design in order to make the residential building particularly attractive and comfortable.

2. Problem definition
The aim of the refurbishment work was to restore the residential building in a contemporary way with regard to both aspects. In the course of planning and creating a schedule, an individual approach was chosen so that the needs of the customer could be optimally incorporated. The design was particularly challenging here, in order to meet the requirements for a unique design.

3. Implementation
The work was completed successfully and according to the agreed schedule. During the construction period, special works were carried out to completely renovate, modernize and refurbish the house. Thanks to the professional services of our specialists and the individual focus on the customer, the interior design could be adapted to the characteristic style of our client.

House renovation in Icking, 150m²

By Projects, Uncategorized

House renovation

PLANNING PERIOD

January – April 2021

GFA

ca. 150 m²

SERVICES

Core renovation with modernization and renovation of the house

1. Inventory:
Our property is a 150m2 single-family house in the vastness of Bavaria from the 1960s. In order to be able to live comfortably and comfortably, it should be renovated and renovated.
The supporting structure was in good condition, but the building needed to be completely renovated. In addition, the roof had to be completely replaced because it no longer met the legal requirements for energy efficiency.

2. Problem definition:
When modernizing, the charm of the house should be retained while at the same time meeting the requirements for thermal insulation. At the same time, the customer’s wishes were taken into account and implemented in the interior design.

3. Implementation:
The work was successfully completed according to the agreed schedule. Appropriate modernization and conversion work was carried out during the construction period. With the professional services of our professionals, the interior design has taken on our client’s signature style.

Roof modernization

By Projects

Roof renovation

Planning period

June 2021

GFA

270 m²

Services

  • Roof modernization

1. Inventory
Our property is a single-family house built in 1971.

2. Problem definition
The house initially had a maximum of 10 cm of insulation that was not continuous. This led to a high heat loss in winter and consequently to high additional costs. In addition, the small number of windows in the roof area resulted in insufficient lighting of the attic.

3 Implementation
A U-value of 0.14 W/m²K was set for the insulation, so that the requirements of the Building Energy Act (GEG) were not met. For this, insulation made of cellulose and wood fibre was laid and fixed with wooden boards. The installation of the thick insulation layer was made possible by raising the wooden rafters by 8 cm. With the subsequent replacement of the roof tiles, the roof was also given a new look externally. In addition, the stone was sealed so that no moisture can penetrate into the house through it.
The final step was the installation of two new Vellux windows, which provide more light in the attic.
With these measures, a well-insulated house was created, which at the same time enjoys the benefits of air-permeable insulation and leads to a pleasant indoor climate.